classes of High School "Primo Levi" Montebelluna are distributed in several separate buildings. Most of them are located at headquarters, where there are also workshops, the Secretariat and the Presidency. The remainder are located in a prefab in the courtyard of the headquarters at the site of the headquarters of the Watch and High School. Consequently
several problems arise, such as the move from their seats to pull the laboratories, the movement of teachers to change the time and no communication problems between the different locations.
It is therefore necessary to build a home including, in one building, all classes and laboratories. The idea is to expand its headquarters, so you do not have to build a brand new home.
We have also decided to design a new assembly hall, as the existing one is too small, and then usually you are forced to carry out meetings in the building. An assembly hall that can serve as a theater and cinema. In so doing the film and theater activities already will be able to take advantage of existing space to suit them.
Taking into account that next year, as the units per hour to 60 minutes of lecture courses, many students are forced to eat at school, a bar is also designed to enable them, and anyone who carries out activities in the afternoon, to eat school.
several problems arise, such as the move from their seats to pull the laboratories, the movement of teachers to change the time and no communication problems between the different locations.
It is therefore necessary to build a home including, in one building, all classes and laboratories. The idea is to expand its headquarters, so you do not have to build a brand new home.
We have also decided to design a new assembly hall, as the existing one is too small, and then usually you are forced to carry out meetings in the building. An assembly hall that can serve as a theater and cinema. In so doing the film and theater activities already will be able to take advantage of existing space to suit them.
Taking into account that next year, as the units per hour to 60 minutes of lecture courses, many students are forced to eat at school, a bar is also designed to enable them, and anyone who carries out activities in the afternoon, to eat school.
The expansion will include the following:
- 21 new classrooms;
- 1 bar;
- an auditorium / cinema / theater into two floors;
- roof terrace.
The expansion consists of a rectangular base in reinforced concrete built on a wing of the school supported by five pillars. These pillars also act as a lift. Four of these were at the four corners of the base, while remaining at the center of the base. This fact allows the connection of enlargement with the rest of the school, while the other four are based on the court. The pillars are concrete while the walls of glass throughout the school. In this way there will be much brighter and therefore enable a saving of electricity for lighting.
All expansion is on three floors.
All expansion is on three floors.
The first floor is devoted to classes, this will in fact sixteen classrooms, a bathroom for the boys, one for females, one for teachers and a closet.
The second floor will include the remaining five classes, two bathrooms and first floor of the theater.
The second floor will include the remaining five classes, two bathrooms and first floor of the theater.
The third floor is the bar, the second floor of the theater and two bathrooms.
The theater will include a control room and play, a stage and dressing rooms, can accommodate about 500 spectators.
On the other hand you will find a roof garden terrace.
Slideshow - The new High School Levi
Nicholas Franco, Alberto Gubert, Alberto Pazzaia (2AT)
0 comments: